Redesigning the SLC’s Gould Street Entrance

Featured

In response to your feedback, we are pleased to announce that we will be redesigning our Gould Street entrance doors! The project is expected to last 10 weeks, from June 19 to August 28, 2017.

With your needs in mind, the new entrance doors will:

  • Be lighter, making them easier to operate
  • Moderate airflow, enhancing temperature control in the SLC  
  • Be more sustainable, adapting to the SLC’s high use frequency
The SLC entrance

Photo by Clifton Li

The SLC will remain open during the redesign and will be accessible to students and the community through an alternative entrance. To access the building, please enter through the Library Building at 350 Victoria Street. From there, simply proceed to Floor 2 and cross the Library bridge leading to the SLC.

Continue reading